Links
Summarized
Field Sample Results
Facility
Analyte Level List
Return Links
Water
System Facilities
Water
System Detail
Water
Systems
Water
System Search
County Map
Glossary
|
Water System Facility Detail
Water System No. : |
IL1930150 |
Federal Type : |
C |
Water System Name : |
CROSSVILLE |
State Type : |
C |
Principal County Served : |
WHITE |
Primary Source : |
GWP |
Status : |
A |
Activity Date : |
01-01-1941 |
|
State Asgn ID No. : |
DISTRIBUTION |
Type : |
DS |
Facility Name : |
CROSSVILLE |
Activity Status : |
A |
Activity Reason
Text : |
|
Activity Status
Date : |
01-01-1941 |
Sampling
Points
Sampling
Point |
Location |
Type |
AI |
REPRESENTATIVE OF A-C PIPE |
DS |
C001001A1 |
107 MAIN STREET |
DS |
C001001A2 |
143 STATE STREET |
DS |
C001001A3 |
105 DAVENPORT STREET |
DS |
C001001A4 |
601 W. MAIN STREET |
DS |
C001001A5 |
121 HAMIL STREET |
DS |
C001001A6 |
807 N. STATE STREET |
DS |
C001001A7 |
105 W. MAIN STREET |
DS |
C001001A8 |
712 SOUTH CROSS |
DS |
C001001P1 |
113 FIFTH ST |
DS |
C002001A1 |
123 INGRAM STREET |
DS |
C002001A2 |
2120 CO. RD. 1950E |
DS |
C002001A3 |
PERRY WHITNEY, SENIOR |
DS |
C002001A4 |
ROB WHITLEY |
DS |
C002001P1 |
RR1 - BOX 162A |
DS |
CHEM001 |
CHEMICAL RESULTS |
DS |
DBPMAX |
807 N STATE ST |
MR |
DOWN |
REPEAT DOWNSTREAM |
DS |
GENDBP |
DBP HISTORICAL SITE |
MR |
LA3R026 |
105 W MAIN ST |
DS |
LP1A015 |
311 INGRAM ST |
DS |
LP3R016 |
709 S. CROSS ST |
DS |
LP3R019 |
105 EISENHOWER ST |
DS |
LP3S003 |
202 MADISON ST |
DS |
LP3S004 |
100 WALLACE ST |
DS |
LP3S007 |
505 4TH ST |
DS |
LP3S009 |
503 W MAIN ST |
DS |
LP3S013 |
107 GOODMAN ST |
DS |
LP3S014 |
303 ROTARY ST |
DS |
OTHER |
REPEAT OTHER |
DS |
PRIVATE PAY |
NON EPA PAYMENT |
DS |
RT-EXTRAS |
ADDITIONAL SAMPLES |
DS |
S2HH1 |
1951 CO RD 1985 NORTH |
DS |
S2HT1 |
807 N STATE ST |
DS |
SP-BOIL ORD |
BOIL ORDERS |
DS |
SP-CONSTR |
NEW CONSTRUCTION |
DS |
SP-SPECIALS |
SPECIAL COLIFORMS |
|
UP |
REPEAT UPSTREAM |
DS |
WQPD001 |
WQ PARAMETER DS RESU |
DS |
Annual Operating
Periods
Start Month |
Start Day |
End Month |
End Day |
Effective Begin Date |
Effective End Date |
|